Map Satellite Text

Line of wind turbines at Molenbeek to be extended

 - ©MCCS

2013-04-16 – The website www.brusselnieuws.be has learnt that the Molenbeek Cultural and Social Cohesion Centre is currently engaged in extending the line of wind turbines by the side of the Canal, which has added colour to the district since 2005, as far as Delacroix.

The Cultural Centre’s coordinator, Dirk Deblieck, told www.brusselnieuws.be: “We have found that these little wind turbines fit very well with Molenbeek’s image and represent a symbol of energy for the centre’s future.”

The work should be complete by the end of April.